Preparation of the 2nd phase of the key project, establishment of the GSM-R system
KÖZOP-2.5.0-09-11-2014-0004
Transport Operational Programme
NISZ Nemzeti Infokommunikációs Szolgáltató Zrt.
-
Installation of the GSM-R system on the Hungarian TEN-T network of approximately 2100 km, and on a further railway line of about 400 km, as well as preparations for phase 2 of the key project aimed at the enhancement of the system; conduct of the public procurement proceedings necessary for the fulfillment of these tasks, conclusion of the relevant contracts.
- Preparation of the feasibility study and the related documents.
- Preparation of the grant documentation and grant applications necessary for receiving funding from the European Union.
- Harmonisation of GSM-R, ETCS development and other closely related developments.
- Preparation of the preliminary environmental impact study, determining whether the planned paths affect Natura 2000 areas.
- Checking heritage protection and archeological relevance.
- Development of the documents of the public procurement procedures necessary for implementation, preparation of the set of technical requirements.
- Conduct of public procurement procedures.
01.04.2014
01.09.2015
HUF 181,606,308
HUF 181,606,308
Országos Fejlesztéspolitikai Koncepció,
Országos Közlekedéspolitikai Koncepció,
Egységes Közlekedésfejlesztési Stratégia 2008-2020,
Közlekedés Operatív Program
100%
E-mail: info@nisz.hu
- ka